Bulk pricing across your whole portfolio.
Don't source one project at a time. We aggregate demand across your developments to get you priority production and portfolio-wide unit pricing.
Cabinets, kitchen & bath, lighting, marble & stone, doors & windows, flooring, sanitary ware — sourced direct at factory prices, coordinated across multiple project sites. We handle procurement for the Moinian Group ($1B+ portfolio) and similar developers.
+ US & EU developers
If it goes into a project — a hotel room, a residential build, an office fit-out — we've probably sourced it. Direct from the factory, coordinated to your delivery schedule.
Kitchen cabinets, vanities, wardrobes, custom millwork. Direct from Foshan/Guangzhou factories.
Faucets, sinks, toilets, showers, tubs. Chaozhou & Foshan hubs. ANSI/CUPC compliant SKUs available.
Recessed, decorative, chandeliers, exterior. UL & ETL-ready for US projects.
Slabs, tiles, mosaic. Direct from Xiamen & Nan'an. Container-optimized for cost per m².
Aluminum systems, interior doors, entry doors. Custom sizes for US framing standards.
Engineered wood, LVT, laminate, carpet tile. Multi-project pricing.
Don't source one project at a time. We aggregate demand across your developments to get you priority production and portfolio-wide unit pricing.
Not just „we shipped it". We time containers to phase-by-phase site readiness, so you're not paying storage on cabinets before drywall is done.
ANSI/CUPC for plumbing, UL/ETL for lighting, ASME for hardware — verified factory-side and documented in your shipment paperwork.
NYC-based developer with a $1B+ real estate portfolio. We handle direct-from-factory sourcing of fixtures, fittings, and FF&E packages across multiple development sites — replacing the layered margin of US distributors.
Yes — that's most of what we do at this scale. We split shipments by phase and site, time them to your GC's schedule, and consolidate paperwork so your ops team gets one invoice per site.
For FF&E going through 2-3 layers of importer/distributor/reseller: typically 15–30% landed cost savings. For direct-from-factory-with-us-as-only-middle-layer: 30–45%. Real number depends on volume, spec, timing.
Yes. We pre-verify factories that carry ANSI/CUPC (plumbing), UL/ETL (lighting), and ASME (hardware) certifications, and pull the docs for your inspector before they ask.
4–6 weeks for spec + supplier lock. 8–14 weeks production + shipping depending on category (cabinets/stone are longer, lighting is shorter). We build a phase-by-phase Gantt so nothing sits in a container yard.
Yes. Every container has pre-shipment QC by our team with photo evidence. If something arrives that shouldn't have, we own the replacement or credit conversation with the factory — you don't fight it alone.